Crews are in the final stages of finishing the one-kilometre tunnel, which has vertical shafts 60 metres deep at either end.
Huge water tunnel under the Fraser River nearing completion
Posted in: News
– 11.09.2015Crews are in the final stages of finishing the one-kilometre tunnel, which has vertical shafts 60 metres deep at either end.